Thermal Dry Floors Have Been Installed And EverLast Wall Panels Are Going Up
Our EverLast Wall Systems are going up! As is the baseboard! The basement is starting to come together, and you can see how it will be a very comfortable and cozy space for the homeowners to play with their rescue dogs in during the cold weather months. The recessed lights that we installed have given this basement a bright warm glow that makes the Thermal Dry floors glimmer and shine.
Finished Project!
We installed one of our beautiful 6-Panel doors to finish the project. It works well with our EverLast Wall Systems and the base color compliments all of our Elite Thermal Dry floors. The door is paintable so the homeowners can customize it if they would like to in the future!
EverLast Wall Panels Are Going Up
Our EverLast Wall Systems are going up! As is the baseboard! The basement is starting to come together, and you can see how it will be a very comfortable and cozy space for the homeowners to play with their rescue dogs in during the cold weather months.
EverLast Wall Panels Are Going Up
Our EverLast Wall Systems are going up! As is the baseboard! The basement is starting to come together, and you can see how it will be a very comfortable and cozy space for the homeowners to play with their rescue dogs in during the cold weather months.
EverLast Walls Are Ready
Our EverLast Wall panel is on the right, the base plastic is on the left. You can see how very different they are, and how much sturdier the EverLast Wall Panels are. The plastic on the left is similar to what many contractors will put over fiberglass insulation, and looking at this photo you can see why we use the EverLast Wall Panels compared to just plastic.
Close Up Of The Installed Flooring
The floors have been installed! Our fantastic Elite Thermal Plank Flooring has been installed and is glowing in the lights (that we also installed). This flooring is our Grey Elite Thermal Plank Flooring, it is extremely durable and easy to keep clean.
The Flooring Has Been Installed
The floors have been installed! Our fantastic Elite Thermal Plank Flooring has been installed and is glowing in the lights (that we also installed). This flooring is our Grey Elite Thermal Plank Flooring, it is extremely durable and easy to keep clean.
The Middle Of The Project, The Floors And Walls Are Prepped
The middle of the project, the floors and walls have been prepared and are ready for our EverLast Wall Systems and our Thermal Dry Flooring to be installed.
The Middle of the Project, Floor Prep
Prepping the floors so they will be ready for our Elite Thermal Dry Flooring to be installed.
The Middle Of The Project
Walls are being insulated and lined.
The Middle Of The Project
Walls are being lined and other walls are starting to have our EverLast panels refinished.
Day 1 - The Ceiling Has Been Painted
Day 1 of the project, the ceiling has been painted, but the walls are still brick and mortar. They will be refinished with our EverLast wall system soon.
Day 1 - The Original Walls
The original walls in this basement were either brick and mortar or were just bare bones boards. These are very ready to be finished.
Day 1 - Painted ceiling
The first part of the process is complete, the ceiling has been painted and the paint is drying.
Before - The Beginning
Before the project was started, the walls were bare brick and mortar.